Hardware - Software

Special project

Projecting, programming, delivery, assemblage and setting into motion of plant for steam production – Boiler 30 t/h steam
STUDEN – AGRANA Rafinerija šećera D.O.O.
TECHNICAL DESCRIPTION
- Finishing of the existing PLC program and system for visualization of the plant for steam production in Studen Agran Factory.
- Delivery of new PC operating cell with 19’’ monitor with minimal characteristics: 2GHz dual core, 1GB RAM, HDD 100Gb, HMI Software (WiCC v7.0) and license for HMI software for OS cell.
- To align working algorithm of the existing PLC program with the technological P&D diagram and control sequences.
- Modify software regulators in PLC program so as to existing SIPART regulators could be scrapped.
- Managing with spreader rollers (3 pieces) change in the sense that controlling is done individually instead of the current group control with all three drives at the same time.
- Modify the communication with PROFIBUS with filter plant (s7-200 PLC with installed EM277 commanding processor).
- Modify the communication with PROFIBUS with DCS Sugar Plant system (EMERSON Delta V). Modify the communication just by the boiler through the  DP/DP caplers.
- Programme the two ways of reacting in case of loss of main power supply. Distinguish normal work and repair work.
- Add controlling system with three new ash carriers.
- Add controlling system with machine for coal spacing in coal bunker.
- Modify the connection with Diamond cabinet (new system with self-control) on the boiler.
- Add the two-way working possibility for spreader plant. The plant in local mod control without holding.
- Secondary ID fan will be controlled with new frequency regulator through PROFIBUS.
- Do the HMI application into WinCC v7.0.
- Do the HMI application on two languages (English and Bosnian).
 

 
 