TPP Tuzla [BiH]: Hydraulic rotator system

Projecting, programming, delivery, assemblage and setting into motion hydraulic rotator systemat termal power plant TE Tuzla

 

 

The project for reconstruction of the electrical equipment on the carriagesrotator No 2 and No. 3.TE Tuzla was replaced with a hydraulic rotator system, made the documentation for a complete rotator (electrical, mechanical and technological part) and is fully replaced and modernized management system and electricity system rotator wagon.

 

The project is included in the global:


Removal of existing equipment, design procurement and delivery of equipment and reconstruction of the rotator performance wagon no. 2 and no. 3 TE Tuzla
Record the existing gearbox, production workshop and project documentation and production of spare elements for a reducer, functional testing, adjusting and commissioning reconstruction rotator wagons, carriages trial rotator No. 2 and no. 3 and the complete system for unloading coal from wagons DU stages III and IV and V DU legs and Tuzla.

 

Design solutions to the reconstruction of the electrical equipment rotator wagon No 2nd and No. 3. TE Tuzla consists of the following units:

 

  • Machine technology of rotator Wagon
  • Hydraulic systems rotator Wagon 
  • Power system rotator Wagon 
  • System management and control rotator Wagon

 

Image  

BEFOREREALIZATIONAFTER
Thumbnail imageThumbnail imagepicture5
Thumbnail imageThumbnail imageThumbnail image
Thumbnail imageThumbnail imageThumbnail image
Thumbnail imageThumbnail imageThumbnail image
Thumbnail imageThumbnail imageThumbnail image
Thumbnail image

Thumbnail image
Thumbnail image